Construction Delay Analysis Techniques: Technique Comparison, Float Analysis, and It Solution - Khalid S. Al-gahtani - Knihy - LAP LAMBERT Academic Publishing - 9783843350709 - 13. decembra 2010
V prípade, že obal a názov nesedia, platí názov

Construction Delay Analysis Techniques: Technique Comparison, Float Analysis, and It Solution

Cena
€ 69,49

Objednané zo vzdialeného skladu

Očakávané doručenie 2. - 10. dec
Vianočné darčeky je možné vrátiť do 31. januára
Dostávajte upozornenia na nové nahrávky interpreta Khalid S. Al-gahtani
Pridať do vášho zoznamu prianí na iMusic

Not rated yet

At the present time, we do not have universally accepted method to precisely determine the construction project delays, their causes or responsibilities. The float ownership is another vague issue and deserves up front assignment, because it can affect the project time and risk as a result of float consumption by the owner and the contractor(s). The current Project Management (PM) software is used as a tool only to manage the project time, cost, and resources without the ability to determine the project delay, acceleration, or float consumption responsibilities that frequently cause the construction projects ending up in litigations. This Book has investigated the delay analysis techniques, and attempted to solve all of the identified weaknesses in analyzing the float ownership and consumption, acceleration impacts, and the effect of concurrent delays. In addition, it studies the current PM software in analyzing delay claim. Finally, a computer programming is introduced to use in analyzing delay claim. If you would like to understand and study the delay analysis techniques in depth, this is the right book to choose.

Médium Knihy     Paperback Book   (Kniha s mäkkou väzbou a lepeným chrbtom)
Vydané 13. decembra 2010
ISBN13 9783843350709
Vydavatelia LAP LAMBERT Academic Publishing
Strany 324
Rozmery 226 × 18 × 150 mm   ·   476 g
Jazyk Angličtina