Povedzte o tejto položke priateľom:
Construction Scheduling with Suretrak 3.0 Dr. Mohamed Hegab
Cena
€ 55,99
vrátane 10% DPH, krajina doručenia: Slovakia
Objednané zo vzdialeného skladu
Očakávané doručenie 11. - 25. dec
Vianočné darčeky je možné vrátiť do 31. januára
Dostávajte upozornenia na nové nahrávky interpreta Dr. Mohamed Hegab
Pridať do vášho zoznamu prianí na iMusic
Construction Scheduling with Suretrak 3.0
Dr. Mohamed Hegab
The book covers the use of the SureTrak® software in easy format by walking through the software in a way similar to the practical use of the software which makes it easy to apply. It has project examples which allow user to grasp the concept and us the software efficiently. SureTrak® is planning and scheduling software that is trademarked and owned by Oracle that can be used in any industry including building, construction, oil & gas and software development.
| Médium | Knihy Brožovaná väzba Bog (Kniha s mäkkou väzbou a lepeným chrbtom) |
| Vydané | 01. februára 2011 |
| ISBN13 | 9781456433123 |
| Vydavatelia | CreateSpace Independent Publishing Platf |
| Strany | 188 |
| Rozmery | 10 × 203 × 254 mm · 385 g |
| Jazyk | Angličtina |
Pozrieť všetko od Dr. Mohamed Hegab